世纪新能源网-新能源行业媒体领跑者,聚焦光伏、储能、风电、氢能行业。
  • 微信客服微信客服
  • 微信公众号微信公众号

Meyer Burger公司赢得了超过6000万CHF的韩国客户订单

   2010-07-23 Meyer burger21世纪新能源16400

总部位于瑞士的Meyer Burger公司和Hennecke 系统公司成功的获取了厂区位于韩国的Nexolon公司6000万CHF(5700万美元)的线锯,ID-锯和硅片检验系统订单。
Nexolon公司计划在明年扩张其850MW的生产能力到1G瓦,在供货声明中Meyer Burger讲的,“为使Nexolon公司产能在2011年年底达到1GW,该公司将倚赖与来自Meyer Burger和Hennecke Systems公司提供的高科技生产设备。”

Meyer Burger wins order for over CHF 60 million with Korean customer
Switzerland-based Meyer Burger Ltd and Hennecke Systems GmbH have successfully concluded a contract of over CHF 60 million (around USD$57 million, ?4.3 million) for wire saws, ID-saws and wafer inspection systems with mono- and multi-crystalline solar wafer manufacturer Nexolon in Korea.

The companies will provide Nexolon with wafer equipment. Image: Meyer Burger Ltd.
Nexolon plans to expand its production capacity from 850 megawatts (MW) to one gigawatt (GW) next year. In a statement, Meyer Burger said: “For the expansion of its production facility to 1GW by the end of 2011, Nexolon relies on the high-tech manufacturing equipment from Meyer Burger Ltd and Hennecke Systems GmbH.”
Nexolon, headquartered in Seoul, Korea, was established in 2007. Its production plant is located in Iksan, Korea.

 
标签: 光伏,生产商
反对 0举报 0 收藏 0 评论 0
 
更多>同类资讯
2024全球光伏品牌100强榜单全面开启【申报入口】 2024第四届中国高比例风光新能源电力 发展研讨会
推荐图文
推荐资讯
点击排行