暂无图片

2011年印度尼西亚能源可持续性、绿色资源与环保科技国际会议及博览会

本届展会

已停止索票

2011-04-13 至 2011-04-16

2011-02-19

6745

MMI Asia Pte Ltd

印度尼西亚 雅加达 查看地图

Jakarta International Expo (JI Expo), Kemayoran

雅加达

--

--

--

6745+ 人

温馨提示

展会举办时间和地点具有一定变更风险,请以收到的电子门票凭证为准,平台也将为预订门票的用户提供电话、短信通知提醒,避免用户出行损失。

通知提醒

添加到我的会展提醒。

同月展会

CONCURRENT EXHIBITIONS
查看更多
展会介绍

http://www.renewables-indonesia.com/homepage.html

Aim: World’s Largest Geothermal Energy User

Indonesia aims to become the world's largest geothermal energy user; a realistic and justifiable goal as the country now ranks as 3rd in terms of geothermal energy consumption after the United States and the Philippines. Indonesia is in possession of 40 percent of world's geothermal resources while energy utilisation is only five percent. The wealth of renewable energy resources, especially geothermal, hydropower and biomass, remains largely unexploited or under developed. In a recent report released by the Ministry of Energy and Mineral Resources, statistics revealed that renewable energy accounts for only 3.4 percent of total potential reserves. 

"Indonesia has the world's largest geothermal power potential.  Some $400 million in support from the Clean Technology Fund (CTF) will help mobilise some $2.7 billion in public and private sector financing to help Indonesia nearly double its geothermal capacity and transform the country's use of renewable energy.  The CTF plan for Indonesia is designed to transform the country's development pattern while supporting its continued economic growth and the plan allocates extensive co-financing to expand large-scale geothermal electricity generation." (Source: The Jakarta Post, 24th March 2010) 

At the opening of the 4th World Geothermal Congress (WGC) at the Nusa Dua resort of Indonesia's tourist resort province of Bali on April 27, 2010, President Susilo Bambang Yudhoyono said "To accelerate the development of geothermal plants, the government could not work alone but will cooperate with international financial institutions and donor countries."  The government has set a target of attracting approximately US$12 billion in new investment for the geothermal sector and a geothermal energy production capacity of 3,977 megawatt (MW) as a part of its second phase 10,000 MW power project.

TARGET 2025: Use of more Renewable Energy
On this note, the government has backed up an initiative to implement the use of more renewable energy by 2025, with the induction of tax oriented incentives, aimed to invite more global investment in the region and in turn, optimally exploit the expanse of natural resources available for this purpose. 

The Energy and Mineral Resources Ministry in Indonesia also announced that "we will optimize energy which has not been used so far, such as geothermal and nuclear energy, as well as coal up to ten folds, so that we could cut the emission by 16 percent." At a seminar by Bogor Institute of Agriculture (IPB), Chief Economic Minister remarked "the government had to build power generators to increase the capacity of its electricity and to boost its economic growth to seven percent before 2014 so that it would be able to increase the competitive edge of its industrial products in the world market".
 

Exhibits profile

★ Renewable Energy

• Bio-Energy
• Emerging Renewables
• Geothermal Energy
• Hydrogen Energy
• Solar Energy
• Waste to Energy
• Water Power
• Wind Energy

★ Green Resources

• CDM & Carbon Trading
• Eco-marketing
• Education & Information / Publications
• Engineering & Consultancy
• Finance & Investment / Grants
• Green Building Products
• Public-Private Sector Partnerships
• R & D and InnovationsRegulatory & Legal Frameworks

★ Environmental Technology / Solution / Innovation

• Air Quality Management, Conditioning, Measurement, Testing & Control Systems
• Bio-degradable / Compostable / Recyclable / Reusable Packaging
• CAD Design for Sustainability
• Cleaning / Antimicrobial Materials, Chemicals, Products & Supplies
• Clean Energy / Recycling & Treatment Systems & Equipment
• Clean Room / Sanitary / Janitorial Hygiene Equipment & Products
• Consultancy, Training & Information Services
• Dry-cleaner's / Laundaries' Equipment, Products & Supplies
• Green Manufacturing & Transportation Systems
• Industrial Cleaning Services, Management & Maintenance
• Oil and Gas Equipment and Supplies
• Piping and Tunneling Equipment for Energy Exploration
• Water / Waste Disposal & Emission Control Systems & Equipment
• Work Wear & Occupational Safety & Health Equipment & Products

MMI Asia Pte Ltd
Contact Person:   Ms. Denise Jones
20 Harbour Drive, #05-04 PSA Vista
Singapore 117612
Tel:         (65) 6236 0988
Fax:        (65) 6236 1966
Email:     info@conbuild-vietnam.com

 

所属行业

展会/博览会

展览面积

+ m²

在线观次

6745+ 人

参展企业

+ 家

主办单位

MMI Asia Pte Ltd

举报收藏 0打赏 0评论 0
联系方式
联系人:Denise Jones
电话:
最新会议活动
推荐会议活动
点击排行

咨询商家 了解更多

入驻

企业入驻成功 可尊享多重特权

入驻热线:400-825-5929

企业微信客服

小程序

小程序更便捷的查找产品

为您提供专业帮买咨询服务

请用微信扫码

公众号

微信公众号,收获商机

微信扫码关注

顶部